Make deployment truth and remaining graduation gates explicit
Some checks failed
verify / verify (push) Has been cancelled

Document the runnable Docker workflow, expected one-shot container exits, server-controlled Bailian namespace switch, current earned progress, and the security and evaluation work that still blocks private-data or graduation release claims.

Constraint: Current local Bailian credentials are rejected by the configured workspace

Rejected: Mark the project complete from synthetic metrics | would overstate provider, OCR, authorization, and blind-evaluation readiness

Confidence: high

Scope-risk: narrow

Directive: Keep progress evidence task-based and distinguish synthetic engineering validation from real geological efficacy

Tested: make verify-design; Markdown links; secret scan; diff checks

Not-tested: Final thesis review and live provider authorization
This commit is contained in:
2026-07-13 05:58:39 +08:00
parent ecdb10c37a
commit 63279cf213
7 changed files with 214 additions and 109 deletions

View File

@@ -165,7 +165,12 @@ features/chat/
每个阶段都必须形成“功能 + 测试 + 文档 + 提交 + 推送”的闭环。
### 阶段 0仓库、安全和设计基线当前阶段
截至 2026-07-13核心 synthetic 上传→解析→审核→向量化→检索链已在 Docker 中连续两次
通过,当前门禁记录为 296 项后端测试和 53 项前端测试。以下阶段描述仍是最终 Definition of
Done不因部分能力提前落地而降低验收标准实时完成度和剩余项以
[04-project-todo.md](04-project-todo.md) 为准。
### 阶段 0仓库、安全和设计基线
交付: