Document the runnable Docker workflow, expected one-shot container exits, server-controlled Bailian namespace switch, current earned progress, and the security and evaluation work that still blocks private-data or graduation release claims. Constraint: Current local Bailian credentials are rejected by the configured workspace Rejected: Mark the project complete from synthetic metrics | would overstate provider, OCR, authorization, and blind-evaluation readiness Confidence: high Scope-risk: narrow Directive: Keep progress evidence task-based and distinguish synthetic engineering validation from real geological efficacy Tested: make verify-design; Markdown links; secret scan; diff checks Not-tested: Final thesis review and live provider authorization
This commit is contained in:
@@ -165,7 +165,12 @@ features/chat/
|
||||
|
||||
每个阶段都必须形成“功能 + 测试 + 文档 + 提交 + 推送”的闭环。
|
||||
|
||||
### 阶段 0:仓库、安全和设计基线(当前阶段)
|
||||
截至 2026-07-13,核心 synthetic 上传→解析→审核→向量化→检索链已在 Docker 中连续两次
|
||||
通过,当前门禁记录为 296 项后端测试和 53 项前端测试。以下阶段描述仍是最终 Definition of
|
||||
Done,不因部分能力提前落地而降低验收标准;实时完成度和剩余项以
|
||||
[04-project-todo.md](04-project-todo.md) 为准。
|
||||
|
||||
### 阶段 0:仓库、安全和设计基线
|
||||
|
||||
交付:
|
||||
|
||||
|
||||